Transport Department issues four official Taxi Fleet Licences (with photos)

Source: Hong Kong Government special administrative region

Transport Department issues four official Taxi Fleet Licences  

Taxi fleet licence number     The TD has approved the taxi livery design and markings of the four fleets. For easy identification by passengers, all fleet taxis are required to display fleet taxi plates at the front and rear of the taxi bodies, and a fleet taxi certificate on the windscreens of the taxis.

     A spokesman for the TD said, “All fleets provide online hailing services. Passengers can book their journeys through the fleets’ mobile applications or other online hailing channels. Fleets also provide customer service hotlines to handle passengers’ enquiries and complaints. Further, all fleet taxis provide multiple electronic payment means, while safety devices including dash cameras, in-vehicle cameras and global navigation satellite systems as well as the driver monitoring system have been installed to provide convenience for passengers and ensure driving safety.”Issued at HKT 12:00

NNNN

Firing practice for August 2025

Source: Hong Kong Government special administrative region

Firing practice for August 2025————————————-
 

DateAugust 2 (Saturday)
August 4 (Monday)
August 5 (Tuesday)
August 6 (Wednesday)
August 7 (Thursday)
August 8 (Friday)
August 9 (Saturday)
August 11 (Monday)
August 12 (Tuesday)
August 13 (Wednesday)
August 14 (Thursday)
August 15 (Friday)
August 16 (Saturday)
August 18 (Monday)
August 19 (Tuesday)
August 20 (Wednesday)
August 21 (Thursday)
August 22 (Friday)
August 23 (Saturday)
August 25 (Monday)
August 26 (Tuesday)
August 27 (Wednesday)
August 28 (Thursday)
August 29 (Friday)
August 30 (Saturday)8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pmTsing Shan Firing Range
——————————-
 

DateAugust 2 (Saturday)
August 4 (Monday)
August 5 (Tuesday)
August 6 (Wednesday)
August 7 (Thursday)
August 8 (Friday)
August 9 (Saturday)
August 11 (Monday)
August 12 (Tuesday)
August 13 (Wednesday)
August 14 (Thursday)
August 15 (Friday)
August 16 (Saturday)
August 18 (Monday)
August 19 (Tuesday)
August 20 (Wednesday)
August 21 (Thursday)
August 22 (Friday)
August 23 (Saturday)
August 25 (Monday)
August 26 (Tuesday)
August 27 (Wednesday)
August 28 (Thursday)
August 29 (Friday)
August 30 (Saturday)8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pm
8am-9pmIssued at HKT 11:00

NNNN

Conférence de presse – lancement des expositions « Architectures contemporaines en terre et en fibres » et « Architectures calédoniennes durables »

Source: Gouvernement de la Nouvelle-Caledonie

Petelo Sao, membre du gouvernement chargé de la construction et du développement de l’innovation technologique, animera mardi 29 juillet à 10 heures au centre culturel Tjibaou, une conférence de presse pour le lancement des expositions « Architectures contemporaines en terre et en fibres » et « Architectures calédoniennes durables ».

Organisées à l’initiative du gouvernement, en collaboration avec le BST ERA du lycée Petro-Attiti, ces expositions mettent en avant des constructions utilisant des matériaux biosourcés et géosourcés à travers le monde et en Nouvelle-Calédonie. Ces techniques traditionnelles et éprouvées, mêlées aux techniques architecturales et aux savoirs contemporains, représentent des solutions techniques vertueuses face aux défis climatiques et à la nécessité d’adopter une construction plus durable et plus respectueuse de l’environnement.

Hong Kong movies showcased at 2025 Fantasia International Film Festival in Montreal (with photos)

Source: Hong Kong Government special administrative region

Hong Kong movies showcased at 2025 Fantasia International Film Festival in Montreal  
     Speaking before the world premiere of “Good Game” on July 27 (Montreal time), the Acting Director of the Toronto ETO, Mr Gavin Yeung, highlighted the efforts of the Hong Kong Special Administrative Region (HKSAR) Government in supporting the development of Hong Kong’s film industry and strengthening Hong Kong’s role as a bridge between East and West for international cultural exchanges.
 
“The HKSAR Government actively finances the production of small-to-medium budget films, provides funding support for the industry professionals to participate in international film festivals, and subsidises training programmes to nurture young directors and film talent,” said Mr Yeung.
 
     He added that Hong Kong’s film industry has been globally recognised. “Hong Kong boasts a rich pool of creative talent and is one of Asia’s leading filmmaking hubs. Over the past decade, our films and filmmakers have received numerous prestigious international awards,” he noted.
 
Also present at the screening was the writer and actor of “Good Game”, Ken Law, who introduced the film before the screening and engaged with the audience during a post-screening Q&A session.
 
The other Hong Kong films featured at the Festival are: “Stuntman”, “A Chinese Ghost Story III”, “The Battle Wizard” and “Bullet in the Head”.
Issued at HKT 3:54

NNNN

Mandai North Crematorium And Garden Of Serenity Will Commence Operations On 15 August 2025

Source: Government of Singapore

Singapore, 28 July 2025 – The new Mandai North Crematorium (MNC) and Garden of Serenity (GOS), operated by the National Environment Agency (NEA), will begin operations on 15 August 2025. MNC will start with four cremation services daily. Cremation services will be ramped up progressively over the coming months.

2          The new facilities, spanning approximately 2.4 ha, have been built in anticipation of demographic changes and an ageing population in Singapore. Annual resident deaths are projected to increase from about 25,000 in 2024 to around 40,000 by 2040. The new crematorium will provide additional cremation capacity, and the GOS will provide an additional option for the inland scattering of ashes. They will enable us to continue serving the nation’s needs in the years ahead.

Facility designed to create a healing environment for the bereaved by integrating greenery and natural lighting within the key spaces

3          The MNC is designed to house six service halls with viewing halls, transfer halls, and 18 cremators. Currently, three service halls are equipped with nine cremators. The ash collection centre is also ready for operations. NEA will fit out the remaining halls and cremators to meet anticipated demand for cremations.

Service hall

4          The new cremation facility offers an innovative design and technological features to enhance operational efficiency, and provide a seamless experience for visitors [1]. Some key features include a layout where service halls and viewing halls are adjacent, reducing walking distances and improving accessibility for all users. Technology is also used to enhance the visitor experience, with automated guided vehicles for coffin transport, and a self-help system at the ash collection centre. A comprehensive process control monitoring system oversees the entire cremation and ash collection process, ensuring service reliability. 

Layout is designed with key facilities positioned side by side on the same level or connected vertically via escalators and lifts, reducing walking distances for visitors.

Automated guided vehicle will be used to transport a coffin from hearse drop off to the service hall

Ash collection station with a self-help system to facilitate collection of cremated ashes

5          The MNC has been awarded the Green Mark (Platinum) by the Building and Construction Authority for sustainability efforts in building design. The environmental features at the facility include greenery in and around the building, a green roof that reduces the heat island effect, efficient underfloor cooling systems, and adoption of low carbon concrete and sustainable building products [2] to reduce the carbon footprint of the building.

6          The GOS, Singapore’s second inland ash scattering facility, is located next to the MNC building [3]. It adopts an open garden concept with designated lanes for walkways and ash scattering [4]. It also incorporates a stormwater detention pond designed as a natural pond. The new facility will enable us to meet increasing demands for inland ash scattering service [5].

 

Garden of Serenity: Landscaping and greenery have been used to create a peaceful, serene garden setting, to provide a dignified and respectful environment for ash scattering

7          NEA will continue to plan ahead to ensure sufficient government after-death facilities and services, and to provide these services in a way that allows bereaved families to come together to send off their loved ones with dignity and respect.

————————————————————

[1] See Annex A for more details on the design inspiration for the facility

[2] Certified by the Singapore Green Building Council or on the Singapore Green Labelling Scheme.

[3] The Garden of Serenity occupies approximately 750 sqm within the new Mandai North facility.

[4] See Annex Bfor more details on the features at Garden of Serenity.

[5] Accumulated ash soil will periodically be transferred from the ash scattering lanes to a designated location within the Garden of Peace (located at the Choa Chu Kang Cemetery) due to limited available space at GOS, to ensure that its lanes remain available for continued use. 

 

~~ End ~~

For more information, please submit your enquiries electronically via the Online Feedback Form or myENV mobile application.

Fatal accident at QMH site probed

Source: Hong Kong Information Services

The Hospital Authority (HA) has expressed concern over a fatal accident today on a construction site at Queen Mary Hospital (QMH), where the Architectural Services Department (ArchSD) is carrying out redevelopment works.

 

This afternoon, a worker employed by a lift engineering subcontractor was trapped in one of the lift shafts. Site management staff immediately called the Fire Services Department to rescue the worker, who was subsequently certified dead upon arrival at QMH’s accident and emergency department.

 

After receiving a report of the accident, the Labour Department immediately deployed staff to the site and is now conducting an investigation.

 

Expressing deep sorrow over the incident, the HA extended its sincere condolences to the deceased worker’s family. It also directed the ArchSD to ensure that the contractor involved provides appropriate assistance to the bereaved and supports them in handling the worker’s after-death arrangements.

 

The HA said site staff from the ArchSD immediately contacted the contractor after the accident to follow the matter up. The contractor has been urged to take the incident seriously and to adopt all necessary measures as soon as possible to ensure site safety. The contractor has also been requested to thoroughly investigate the cause of the incident and submit a report to the ArchSD and the HA, with a view to preventing similar accidents from happening again.

 

The HA added that it will urge the ArchSD and the contractor to fully co-operate with the Labour Department and enforcement agencies in their investigations.

Hospital Authority’s statement regarding an industrial accident at Queen Mary Hospital redevelopment project construction site

Source: Hong Kong Government special administrative region

Hospital Authority’s statement regarding an industrial accident at Queen Mary Hospital redevelopment project construction site 
The redevelopment project of QMH is being carried out by the Architectural Services Department (ArchSD). This afternoon, the HA was notified by the ArchSD that a worker employed by a lift engineering subcontractor was trapped in one of the lift shafts during work. The site management of the contractor immediately called Fire Services Department to rescue the worker, who was then sent to the Accident and Emergency Department of QMH for emergency treatment. The worker was certified dead upon arrival at the Accident and Emergency Department.
 
The HA expresses deep sorrow over this incident and extends its sincere condolences to the deceased worker’s family. The HA has directed the ArchSD to ensure that the contractor provides appropriate assistance to the family and supports them in handling the family member’s after-death arrangements.
 
The HA is very concerned about the incident. Since the lifts involved in the project have not yet undergone all required works and adjustments, and have not been handed over for use and management by QMH. The HA is aware that site staff from the ArchSD immediately contacted and followed up with the contractor after the accident. The contractor has been urged to take the incident seriously and to adopt all necessary measures as soon as possible to ensure site safety. The contractor has also been requested to thoroughly investigate the cause of the incident and to submit a report to the ArchSD and the HA as soon as possible to prevent similar accidents from happening again.
 
The HA has always placed paramount importance on industrial safety at hospital construction sites. The HA notes that the contractor will report this incident to the Labour Department, and the HA will also urge the ArchSD and the contractor to fully co-operation with the Labour Department and other relevant enforcement agencies in their investigation.
Issued at HKT 22:41

NNNN

Govt condemns foreign officials

Source: Hong Kong Information Services

The Hong Kong Special Administrative Region Government today said it strongly opposes and disapproves of smears by government officials and politicians from the US, Canada and Australia, and by anti-China organisations, regarding its lawful acts to pursue individuals wanted in connection with national security offences who have absconded from Hong Kong.

Nineteen people suspected of involvement in a subversive organisation named the “Hong Kong Parliament”, in breach of Article 22 of the National Security Law (HKNSL), have been put on the city’s wanted list.

In a statement, the Hong Kong SAR Government explained that the HKNSL is applicable to Hong Kong permanent residents, and to incorporated or unincorporated bodies set up in Hong Kong, if such residents or bodies commit offences under the HKNSL outside the Hong Kong SAR. Additionally, it said, the HKNSL is applicable where offences under it are committed elsewhere against the Hong Kong SAR by individuals who are not Hong Kong permanent residents.

The Hong Kong SAR Government stressed that the Hong Kong Police Force therefore has a responsibility to pursue, in accordance with the law, people suspected of committing offences under the HKNSL outside of Hong Kong. Acts smearing Hong Kong’s work to safeguard national security are hypocritical and irresponsible, and will not win any public support, it added.

The statement iterated that both the HKNSL and the Safeguarding National Security Ordinance clearly stipulate that human rights shall be respected and protected in safeguarding national security in the Hong Kong SAR, but clarified that the Hong Kong SAR Government will not condone criminal acts, and will not give up pursuing them those who commit them.

Emphasising that absconders should not think that they can evade criminal liability by absconding from Hong Kong, the Hong Kong SAR Government also remarked that no country or organisation should harbour criminals or try to exonerate absconders.

Any attempt by foreign countries or external forces to undermine Hong Kong’s situation will be doomed to fail, the Hong Kong SAR Government added, reiterating that it will continue to discharge its duty in safeguarding national security unwaveringly.